Gas Turbine Ground Testing Pylon

The case study follows how Frewer Engineering mobilised our multi-disciplinary team to deliver a new pylon design that could demonstrate cleaner, more efficient flight as our customer’s engine sizes continue to increase.

This study includes:

  • Withstand Larger Loads
  • Increase Size, Reduce Mass
  • Flight-Tuned Stiffness

Recent Case Studies

Supporting Manufacturing Advancements

This case study outlines how Frewer Engineering supported FalconWorks®, BAE Systems R&D division in the Air sector, in the development of manufacturing capabilities that keep the UK at the cutting edge of combat air capability.

read more

Gas Turbine Composite Air Intake

This case study follows how Frewer Engineering’s customer required an “Airmeter” air intake to accurately control and monitor air flow into their engines, allowing them to optimise their latest gas turbine engine designs.

read more

Fluid-Loaded Structural Analysis

The case study follows Frewer Engineering’s look into combined computational fluid dynamics (CFD) & finite element (FE) stress analysis for structures under complex fluid loading conditions such as wind & wave loads.

read more

High-Temperature Test Equipment

This case study demonstrates how Frewer Engineering provides design & analysis for high-temperature & pressure test equipment. This includes pipework, custom vessels & complex geometries such as combustors or internal air systems.

read more